We are proud to announce the installation of highest chairlift in Northern Michigan! A brand new Doppelmayr, triple chair is currently being installed for the 2016/2017 season.
The new chairlift will have a top elevation of 1561′ and will provide an incredible 360 degree view of the surrounding Manistee National Forest.
The new fixed-grip triple chairlift will better serve the North Peak complex. The chair will unload at the top of North Peak 15 vertical feet higher than the North Peak Quad Chair. This will allow easy access to both the green runs on the back side (Smiling Irishmen, Easy Street, Shelter) and the more advanced runs on the front side (Canyon, Lift Line, No. 1, Cruiser).
The new chairlift will increase our uphill capacity, which will reduce lift lines at the bottom of North Peak.
Below are the latest postings from the Hanson Hills Page On Facebook.
<>
This message is only visible to site admins Problem displaying Facebook posts.
PPCA Error: Due to Facebook API changes it is no longer possible to display a feed from a Facebook Page you are not an admin of. The Facebook feed below is not using a valid Access Token for this Facebook page and so has stopped updating.
Below are the latest postings from the Crystal Mountain Page On Facebook.
<>
This message is only visible to site admins Problem displaying Facebook posts.
PPCA Error: Due to Facebook API changes it is no longer possible to display a feed from a Facebook Page you are not an admin of. The Facebook feed below is not using a valid Access Token for this Facebook page and so has stopped updating.